Drainage and Trail Project


The drainage and trail replacement project consists of the reconstruction of the trail system from Telegraph Road to D’Evereaux Circle and work to provide a stabilized condition to help alleviate water ponding and soil erosion in the community common spaces behind various townhomes. This project is the continuation of phases 2-5 of the trail replacement and drainage abatement plan. This project is scheduled to begin on May 1st, 2017.

The project was awarded to Ridge Limited Company and includes Brothers Paving as a subcontractor on this project. GJB Engineering was hired to provide engineering and field oversight on the project.

The following streets and areas will be impacted by this project:

  • Harbour Court

  • Martinique

  • Leeward Lane

  • St Genevieve

  • Cannes Court

  • Pleasure Cove

  • Chapel Cove

  • Admiralty Court

  • Heatherway Court

  • Devereux Circle Drive

A information session is being offered before the April 27th, 2017 Board of Directors Meeting at the Franconia Government Center at 6:30PM and event details can be found on the Calendar Page.

Kristine Caraway and Michelle Baquero of NRP Management are the primary contacts during the duration of this project. Report any concerns or complaints directly to NRP Management.

-Board of Directors

96 views0 comments

Recent Posts

See All

Trash Service Update

Trash service for Tuesday, September 01, 2020 has been delayed. Services will be performed on Wednesday, September 02, 2020. Please leave your items out for collection tonight to ensure pickup on We

Tot Lots Closed (COVID-19)

Effective immediately the community tot lots and common areas are closed so as to prevent social gatherings. Virginia Governor, Ralph Northam, announced a stay-at-home order for Virginians on Monday (